How EFCO’s Formwork Systems Streamlined Productivity and Safety

St. Petersburg, Florida  

Building St. Petersburg Skyline with EFCO Solutions

Located in St. Petersburg, Florida, the 400 Central project marks a major milestone as the city’s tallest building and the first in Florida to utilize EFCO’s POWER TOWER® PT-100 system. Throughout construction, the top priorities were maximizing productivity, reducing crane time, and ensuring structural integrity and safety. EFCO’s formwork systems were specifically chosen to meet these goals, offering a streamlined, efficient approach that optimized both construction speed and project management.

EFCO Solutions Deliver Lowest In-Place Concrete Cost

Baker Construction, the primary contractor, turned to EFCO due to a longstanding, trusted relationship and proven ability to help customers achieve the Lowest In-Place Concrete Cost (LIPCC). After evaluating project needs, Baker integrated the POWER TOWER PT-100 system, EFCO LITE® for shear walls, and the PLATE GIRDER® system. This combination allowed walls and slabs to be poured simultaneously – a significant time saver.

The PT-100 system’s rapid cycle process enabled core climbing in less than four hours, giving Baker a clear edge over traditional methods. Each PT-100 cycle unfolds in a sequence: first, ties are pulled, then the outside formwork is stripped and flown up to storage. Corners are stripped, thru bolts are removed, and the cycle height is set. With a quick activation, the system advances to the next level. Thru bolts are installed, corners are extended, and exterior formwork is re-installed—ready to repeat the process. This efficient system saved Baker countless hours compared to traditional methods, accelerating project timelines by freeing up crane time for other areas of the project. At the same time, it kept labor costs down, showcasing the effectiveness of advanced construction technology.

Pre-Assembled Components Offered Efficiency

To enhance productivity, EFCO utilized the E-BEAM® & SUPER STUD® systems and preassembled the formwork, including shear walls, which significantly boosted efficiency and safety. The addition of a stilt system, which uses tall, adjustable supports anchored to lower slabs, allowed simultaneous pouring of the slab and wall by supporting the wall formwork from below, further reducing the cycle time. The PT-100 system’s quick cycle times allowed core climbing in approximately four hours (from stripping forms to resetting forms on the next level) giving Baker a substantial advantage over traditional methods. EFCO’s system also featured storage platforms that could support up to 178 linear feet (54.3 m) of the 12-foot-tall (3.6 m) core wall formwork that weighed 47,000 pounds (21,320 kg). This streamlined the workflow and minimized crane dependency, all while maintaining safety and quality.

EFCO On-Site Support

EFCO’s Field Service team delivered on-site support and training, sharing best practices for maintaining optimal cycle times and implementing safe assembly techniques. Through close collaboration, EFCO worked to troubleshoot challenges in real-time, ensuring that Baker’s team could complete each stage with confidence. This hands-on guidance allowed Baker’s team to become self-reliant as the project advanced, leading to greater efficiency on-site.

 

 

With EFCO’s system, we saved significant crane time because it lifts itself up. The one-touch jack feature raises everything at once, unlike other systems where you have to lift multiple times. I also appreciated how it kept the walls plumb and the thoughtful design with storage on top—we didn’t have to fly everything down every time, which further minimized crane usage. Our crane time is valuable, and this system helped us make the most of it. Overall, it’s a great system; we liked it and would absolutely use it again.

-Javier Diaz, Site Superintendent

Why Baker Construction Chose EFCO

Baker Construction chose EFCO solutions for their proven ability to boost productivity and reduce costs. EFCO’s POWER TOWER® PT-100 system optimized crane usage and enabled quick core climbs, speeding up the construction timeline and reflecting EFCO’s commitment to quality and innovation. Paired with EFCO LITE® for shear walls and the PLATE GIRDER® system, this approach allowed simultaneous wall and slab pours, enhancing efficiency, achieving the Lowest In-Place Concrete Cost, and showcasing EFCO’s dedication to super service. EFCO’s Field Service team provided on-site training and support, enabling Baker’s team to work independently and maintain high productivity, reinforcing EFCO’s values of quality and integrity.

EFCO EQUIPMENT

EFCO LITE®

POWER TOWER® PT-100®

Round Column®

PLATE GIRDER®

 

SEARCHING FOR AN EFCO OFFICE NEAR YOU?

Discover a location in your area!

BAKER Team

Jim Kelly, Project EXE

Todd Doederlein, Senior Project Manager

Peter Jensen, Project Engineer

Joshua Hernandez, Regional Safety Manager

Jame Urbanek, Project Field safety

EFCO FORMWORK Specialists – ORLANDO

Douglas Whipple, Senior Territory Manager

Bradley Wherley, Field Supervisor

Jesse Mohle, P.E., Engineer

Trusted Formwork Partner

Why Trust Anyone Else?

We are ready to assist you in finding the best forming and shoring solutions for your construction projects. 

Contact Us Today! 

Why Trust Anyone Else but EFCO