About the Customer

Company: The Carey Group

Project Location: Winchester, England

Project Overview

The Leckford Mushroom Estate project is comprised of three sections: material, portal, and bunker halls.

Project Requirements

  • Hall walls, measuring 24′ (7,300 mm) high and over 164′ (50,000 mm) long
  • Leckford required a smooth, uniform, and blemish-free F4 concrete finish with minimal joints and minimal tie holes

Formwork Used

PLATE GIRDERĀ®

Customer Benefit

  • 8′ x 4′ (2400 mm x 1200 mm) tie spacing grid, a high-quality, architectural concrete finish, single-line panel joints plus the labor savings of fast assembly and re-usable taper ties
  • Large gangs of PLATE GIRDERĀ® forms measuring 53′ x 24′-6″ (16200 mm x 7500 mm) were used to cycle the pours, keeping the project on schedule and within specifications

 

Thanks for the exemplary service you gave to my site team and for the high quality of kit delivered.

Matt Collier, Carey Civil Engineering

Leckford Mushroom Estate - Winchester, England
Leckford Mushroom Estate - Winchester, England
Leckford Mushroom Estate - Winchester, England
Leckford Mushroom Estate - Winchester, England
Leckford Mushroom Estate - Winchester, England
Leckford Mushroom Estate - Winchester, England
Leckford Mushroom Estate - Winchester, England
previous arrow
next arrow
Slider

REQUEST INFORMATION