About the Customer

Company: Panedile SA-Tecma SA-UTE

Location: Bahía Blanca, Buenos Aires, Argentina

Project Overview

  • Five sedimentation tanks
  • Three anaerobic digester tanks
  • Aerobic reactor and a sand trap

Project Requirements

  • Adaptable formwork to fit the needs of a contractor
  • Interchangeable, large panel form system that can be assembled and adjusted to any radius either a concave or convex shape.

Formwork Used

REDI-RADIUS®

E-Z DECK®

SUPER STUD®

E-BEAM®

Z-BEAM®

E-Z SHORE®

Customer Benefits

  • Lowest in-place concrete cost
  • Interchangeable large panel form system
  • Adjustable to any radius, concave or convex shape
  • Engineered shoring used to fly and move together in a large modular unit

We chose the EFCO systems because we considered having the variety that best adapted to our needs and is, in our opinion, the one that met the best conditions for the objectives sought. Already with the advanced work, we can say that the results pursued were totally satisfactory according to our expectations.

– Guillermo Marchese, Engineer Coordinator and Chief of Technical Office

Primera Cuenca Water Treatment Plant - Bahía Blanca, Buenos Aires, Argentina
Primera Cuenca Water Treatment Plant - Bahía Blanca, Buenos Aires, Argentina
Primera Cuenca Water Treatment Plant - Bahía Blanca, Buenos Aires, Argentina
Primera Cuenca Water Treatment Plant - Bahía Blanca, Buenos Aires, Argentina
Primera Cuenca Water Treatment Plant - Bahía Blanca, Buenos Aires, Argentina
Primera Cuenca Water Treatment Plant - Bahía Blanca, Buenos Aires, Argentina
Primera Cuenca Water Treatment Plant - Bahía Blanca, Buenos Aires, Argentina
previous arrow
next arrow
Slider

REQUEST INFORMATION

  • This field is for validation purposes and should be left unchanged.