About the Customer

Company: Brockmiller Construction

Project Location: Fenton, Missouri

Formwork Specialist-Des Moines

Jacob Guck, EFCO Territory Manager
Matt Harrington, EFCO Field Supervisor
Nathan Witte, EFCO Engineer

Project Requirements

Formwork For Concrete Digester Walls

4′ (1.2 m) tall starter wall

The highest portion of the wall was 24′ (7.3 m) high with a width of 2′-2″ (660 mm).

The digester measures 84′-4″ x 82′-7″ (25.7 m x 25.2 m) with a 2′-8″ (815 mm) thick divider wall down the middle.

Circular Formwork For Clarifier Walls

1′ (300 mm) thick clarifier measures 42′-6″ (13 m) radius and was 17′-8″ (5.4 m) tall.

Formwork Used

EFCO LITE®

REDI-RADIUS®

Project Overview

Forming & Shoring for Concrete Construction

The Fenton Wastewater Treatment Plant sets next to the Meramec River. Heavy flooding, including a 500-year flood in December of 2015, has taken its toll on the Wastewater Treatment Facility.

Customer Benefits

Up Front Planning, Engineering and Training

To minimize the number of construction joints, bulkheads, pump truck charges and manpower, Brockmiller formed and poured this digester in two pours

Optimizing Formwork Construction Process

This digester was poured in two pours, 11,000 ft² (1,020 m²) of EFCO LITE forms with six carpenters.

The 1′ (300 mm) thick clarifier was poured in two pours, clarifier measures 42′-6″ (13 m) radius and was 17′-8″ (5.4 m) tall using REDI-RADIUS formwork.

 

Fenton Wastewater Treatment Plant – Fenton, Missouri
Fenton Wastewater Treatment Plant
Fenton, Missouri
Fenton Wastewater Treatment Plant – Fenton, Missouri
Fenton Wastewater Treatment Plant
Fenton, Missouri
previous arrow
next arrow