About the Customer

Company: Shimmick Construction

Project Location: San Diego, California

Project Requirements

  • Solar power energy for renewable energy
  • Foundation included a 42′ (12.8m) long 3:1 sloped perimeter
  • Each reservoir measures 421’x388′ (128m x118m) up to 32′ tall

Formwork Used

EFCO LITE®

ROUND COLUMN®

E-Z DECK®

Project Overview

  • Chlorine contact chamber
  • 2 concrete water tanks
  • Increase storage to 58M gallons (220M liters) of water

Customer Benefits

  • Efficient pour sequence and formwork cycle plan
  • Easily change gang heights and lengths of formwork between pours
  • Efficient shoring layout that supports flat decks and column capitals
  • Jacks that slide into either end of shore posts to provide length adjustment from 5″ (125 mm) to 38″ (965 mm)
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
Miramar Clearwell Reservoir – San Diego, California
previous arrow
next arrow