EFCO’s formwork solution for the slab used support from the beam shoring for slabs with lengths up to 4 m between beam faces without having any intermediate floor support.
Back to NewsKrista Jaspering
December 1, 2020
December 1, 2020
EFCO’s formwork solution for the slab used support from the beam shoring for slabs with lengths up to 4 m between beam faces without having any intermediate floor support.
Back to News