About the Customer

Hensel Phelps Logo

Company: Hensel Phelps Construction of Denver, Colorado

Project Location: Denver, Colorado

 

Project Requirements

  • Grade beams were 12′ (3.6 m) thick and 7′ (2.1 m) in height
  • One-sided wall with pour height was 10′ (3.0 m)
  • Two-story garage core
  • Three-cell elevator core 16′ (4.8 m) tall
  • 12″ (300 mm) step at level 29

Formwork Used

PLATE GIRDER®

SUPER STUD & E-BEAM®

POWER TOWER®

Guided Rail System (GRS)®

Project Overview

Constructing a 40-story highrise building in Denver, Colorado.

 

Customer Benefits

  • Using the state-of-the-art POWER TOWER® system maximized productivity and minimized parts and labor to provide the Best Value and Lowest In-Place Concrete Cost
  • Easily stripped cores using EFCO’s Combination Bias Corners (CBC)
  • Rails attached to the wall keep the total form system package attached to the wall during the form lifting process to resist unexpected winds
  • Low cost alternative, SUPER STUD & E-BEAM®, features are unmatched in the concrete construction industry
40-Story Highrise Buillding – Denver, Colorado
40-Story Highrise Buillding – Denver, Colorado
40-Story Highrise Buillding – Denver, Colorado
40-Story Highrise Buillding – Denver, Colorado
40-Story Highrise Buillding – Denver, Colorado
40-Story Highrise Buillding – Denver, Colorado
40-Story Highrise Buillding – Denver, Colorado
40-Story Highrise Buillding – Denver, Colorado
40-Story Highrise Buillding – Denver, Colorado
40-Story Highrise Buillding – Denver, Colorado
40-Story Highrise Buillding – Denver, Colorado
40-Story Highrise Buillding – Denver, Colorado
previous arrow
next arrow