University of Colorado Anschutz Health Sciences Building
Project Requirements
- Foundation and numerous sizes of complex pilasters around the perimeter of the job
- Four Cores
- Various Columns
Formwork in Use
Project Overview
Building the Anschutz Health Sciences Building at the University of Colorado Anschutz campus.
Customer Benefits
- EFCO PLATE GIRDER® forms to cast the foundation and numerous sizes of complex pilasters around the perimeter of the job.
- Cores on this project, used PLATE GIRDER® forms going slab to slab. The core systems will cycle floor to floor with the crane as the slabs go up around them.
- Each core was equipped with a Flipper Lock platform built with E-BEAMS and SUPER STUDS® for access. Flipper Lock platforms cycle upward into pockets cast into the next pour.
- Column sizes were formed using EFCO LITE® as well as PLATE GIRDER® formwork.