Project Overview

Procurement Partner – Why Trust Anyone Else? 

The joint venture of Kenny-Kraemer NA was the engineering procurement and construction contractor chosen through a best-value procurement process. It is essential to minimize costs in your procurement process. Still, it is also vital to identify suppliers who can provide the quality of goods and services that your company needs and who have a record of delivering reliably. Kenny-Kraemer NA chose EFCO. Why trust anyone else? 

Customer Benefits

Setting and Stripping Formwork Monolithically 

The 86’ long x 9’ wide x 12’ tall pier cap relied on the capacity of SUPER PLATE GIRDER® formwork for the soffits to support the placement of approximately 1.4 million pounds (635,029 kg) of concrete and rebar. EFCO also provided pier stem formwork that allowed them to pour the 7’ and 8’ diameter piers up to 62’ monolithically.  

 

About the Customer

Company: Kenny-Kramer JV

Project Location: Jolier, Illinois

 

Formwork Specialists – Chicago

Joben Grimmius, EFCO Territory Manager 

Paul Huisinga,  EFCO Sr. Field Supervisor   

Zach Scholten,  EFCO Engineer 

Project Requirements

  • Radiused support brackets to hold the cap
  • Being able to cycle the forms efficiently was a priority
  • Constructing the pier caps monolithically
  • multi-stem piers
  • minimize costs in your procurement process

 

Formwork Used

EFCO Round Column®

PLATE GIRDER®

SUPER PLATE GIRDER®

Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
Houbolt Bridge | Joliet, Illinois
previous arrow
next arrow