About Customer

Joseph B Fay Company / Fay, an i+iconUSA Company Logo

Company: Joseph B Fay Company / Fay, an i+iconUSA Company

Project Location: Pittsburgh, Pennsylvania

Project Requirements

  • Four multi-stem piers that will support the three-acre (1.2 hectare) park

Formwork Used

Round Column

PLATE GIRDER

Project Overview

The project consists of the construction of a new cap park structure that will span over part of the I-579 Crosstown Boulevard. The surface of the cap will be transformed into three acres of public green space to be easily accessed by pedestrian pathways and bicycle paths. The area will provide recreational, performance and educational spaces, as well as rain gardens. Construction is expected to be completed in November of 2021.

Customer Benefits

  • Standard Ø36″ (Ø900 mm) Round Column forms for the stems
  • Single-cap form consisting of EFCO’s PLATE GIRDER® system. The pier caps were poured in phases and each one had a different length
  • The EFCO System enabled Joseph B Fay Co to cycle the equipment with minimal rework in a very compact Mid-town Pittsburgh jobsite

 

I-579 Cap Urban Connector – Pittsburgh, Pennsylvania
I-579 Cap Urban Connector – Pittsburgh, Pennsylvania
I-579 Cap Urban Connector – Pittsburgh, Pennsylvania
I-579 Cap Urban Connector – Pittsburgh, Pennsylvania
I-579 Cap Urban Connector – Pittsburgh, Pennsylvania
I-579 Cap Urban Connector – Pittsburgh, Pennsylvania
I-579 Cap Urban Connector – Pittsburgh, Pennsylvania
I-579 Cap Urban Connector – Pittsburgh, Pennsylvania
I-579 Cap Urban Connector – Pittsburgh, Pennsylvania
I-579 Cap Urban Connector – Pittsburgh, Pennsylvania
I-579 Cap Urban Connector – Pittsburgh, Pennsylvania
I-579 Cap Urban Connector – Pittsburgh, Pennsylvania
previous arrow
next arrow