Hooton Bio Power Station
Project Requirements
- Environmentally Friendly
- 66′ (20m) tall fuel unloading and fuel storage area
- Retaining walls
- Gasification and turbine pedestals
Formwork Used
Project Overview
Power Station will convert 264,500 tons (240,000 tonnes) of municipal waste through fluidized-bed advanced gasification process into 200 GWh of electricity annually. Sufficient power to service 50,000 homes.
Customer Benefits
- The SUPER STUD Catch Brackets provide a safe and efficient method for steel fixing and plumbing walls climbing vertically
- Consistent and high-quality finish