About the Customer

Company: Sword Construction UK, Ltd

Location: Cheshire, United Kingdom

Project Requirements

  • Environmentally Friendly
  • 66′ (20m) tall fuel unloading and fuel storage area
  • Retaining walls
  • Gasification and turbine pedestals

Formwork Used

SUPER STUD®

PLATE GIRDER®

Project Overview

Power Station will convert 264,500 tons (240,000 tonnes) of municipal waste through fluidized-bed advanced gasification process into 200 GWh of electricity annually. Sufficient power to service 50,000 homes.

Customer Benefits

  • The SUPER STUD Catch Brackets provide a safe and efficient method for steel fixing and plumbing walls climbing vertically
  • Consistent and high-quality finish
Hooton Bio Power Station – Cheshire, United Kingdom
Hooton Bio Power Station – Cheshire, United Kingdom
Hooton Bio Power Station – Cheshire, United Kingdom
Hooton Bio Power Station – Cheshire, United Kingdom
Hooton Bio Power Station – Cheshire, United Kingdom
Hooton Bio Power Station – Cheshire, United Kingdom
Hooton Bio Power Station – Cheshire, United Kingdom
Hooton Bio Power Station – Cheshire, United Kingdom
Hooton Bio Power Station – Cheshire, United Kingdom
Hooton Bio Power Station – Cheshire, United Kingdom
previous arrow
next arrow