About the Customer

Company: Icono Ingeniería and Construcción Ltda and Ticom S.A.

Project Location: Barranquilla, Atlántico, Colombia, South America

Project Requirements

  • Intermediate beams up to a height of 11′-8″ (3.55 m) between level 2 and 3 for nine axes with a span of 19′-1/2″ (5.8 m)
  • The slab of the third level at a height of 19′ (5.78 m)
  • Sloping beams and slabs for the stands

Formwork Used

E-Z DECK®

Project Overview

Stadium needed for the Central American and Caribbean Games of 2018.

Customer Benefits

  • Hinged jaw clamp made it easy to connect and remove panels and accessories, optimizing labor
  • Swivel head of the E-Z DECK® is a safe and easy to use the accessory with a sloping beam and slabs of the stand
Stadium Moderno Julio Torres – Barranquilla, Atlántico, Colombia
Stadium Moderno Julio Torres – Barranquilla, Atlántico, Colombia
Stadium Moderno Julio Torres – Barranquilla, Atlántico, Colombia
Stadium Moderno Julio Torres – Barranquilla, Atlántico, Colombia
Stadium Moderno Julio Torres – Barranquilla, Atlántico, Colombia
Stadium Moderno Julio Torres – Barranquilla, Atlántico, Colombia
Stadium Moderno Julio Torres – Barranquilla, Atlántico, Colombia
Stadium Moderno Julio Torres – Barranquilla, Atlántico, Colombia
Stadium Moderno Julio Torres – Barranquilla, Atlántico, Colombia
Stadium Moderno Julio Torres – Barranquilla, Atlántico, Colombia
Stadium Moderno Julio Torres – Barranquilla, Atlántico, Colombia
Stadium Moderno Julio Torres – Barranquilla, Atlántico, Colombia
previous arrow
next arrow