Stadium Moderno Julio Torres
About the Customer
Company: Icono Ingeniería and Construcción Ltda and Ticom S.A.
Project Location: Barranquilla, Atlántico, Colombia, South America
Project Requirements
- Intermediate beams up to a height of 11′-8″ (3.55 m) between level 2 and 3 for nine axes with a span of 19′-1/2″ (5.8 m)
- The slab of the third level at a height of 19′ (5.78 m)
- Sloping beams and slabs for the stands
Formwork Used
Project Overview
Stadium needed for the Central American and Caribbean Games of 2018.
Customer Benefits
- Hinged jaw clamp made it easy to connect and remove panels and accessories, optimizing labor
- Swivel head of the E-Z DECK® is a safe and easy to use the accessory with a sloping beam and slabs of the stand