Project Requirements
Formwork with Pour Windows | PLATE GIRDER
BR DEMON Tank: a 101′-9″ (31 m) wide, 229′-8″ (70 m) long and 23′ (7 m) high structure requiring 386 tons (350 tonnes) of iron, 2,354 yd3 (1800 m3) of concrete and the installation of 43,050 ft2 (4000 m²) of EFCO’s PLATE GIRDER formwork with pour windows.
High Performance Formwork for Wall Structure | Formwork For Straight Walls
SBR CYCLOR Tank: a 91′-10″ (28 m) wide, 213′-4″ (65 m) long and 23′ (7 m) high structure requiring 386 tons (350 tonnes)of iron, 2,485 yd3 (1900 m3) of concrete and the installation of 48,440 ft2 (4500 m²) of EFCO’s PLATE GIRDER.
Innovative Formwork Solution for Construction of Building
DEMON and CYCLOR Blower Buildings: Two buildings of 1,940 ft2 (180 m²) and 16′-5″ (5 m) high each completed with EFCO’s HAND-E-FORM® panels and E-Z DECK® shoring.
Concrete Finish | Steel Formwork
Smaller Tanks: These structures required 198 tons (180 tonnes) of iron, 1,308 yd3 (1000 m3) of concrete and the installation of 26,910 ft2 (2500 m²) of EFCO’s HAND-E-FORM and E-Z DECK.
Formwork Used
Project Overview
The water company, Aguas Andinas, through its Mapocho El Trebal plant, is located in the western suburb Padre Hurtado in the Metropolitan Region. The plant processes half of the wastewater for the region with a treatment capacity of 8 m3/sec of purification. Aguas Andinas has started an ambitious project of converting the plant into a Biofactory. This solution is designed to support green initiatives through a series of environmental activities. The new plant will not generate residue nor impact the environment and will produce its own energy thus avoiding the consumption of fossil fuels. It will create a virtuous circle in favor of the environment and against global warming.
Customer Benefits
A High-Quality Concrete Finish
EFCO Formwork, Why Choose Anyone Else?
Fewer Ties Per Square Meter
EFCO’s PLATE GIRDER Formwork System up to 32 ft² (2.88 m²) of formwork per tie which means fewer holes to patch.
Pour Windows
Versatile and useful.
Option to Cycle Formwork in Large Gangs
Cycling the formwork in large gangs for better productivity.