How EFCO’s Solutions Drive Success in Malaysia’s Data Centre Project

Cyberjaya, Selangor, Malaysia  

A Milestone in Concrete Construction

The five-story Data Centre Project in Malaysia is a significant milestone in concrete construction, celebrated for its complexity and positive impact on the local community. This state-of-the-art facility enhances the region’s digital infrastructure and supports the growing demand for technology. As one of several projects in Malaysia utilizing EFCO formwork solutions, it highlights the versatility and efficiency of EFCO’s systems in international markets.

Choosing EFCO for Superior Performance

China State Construction & Engineering (M) Sdn Bhd, a renowned contractor, selected EFCO for its reputation for delivering reliable and innovative formwork solutions. EFCO provided a comprehensive range of systems tailored to the project’s needs, including pile cap and column formwork, lift core wall forms, and loading platforms. Key products such as the E-Z DECK® Shoring System, PLATE GIRDER® Column Formwork, and SUPER STUD® System ensured efficient and safe project execution. Demonstrations from past projects and jobsite visits further convinced the contractor to switch from their usual supplier, recognizing EFCO’s ability to deliver superior results.

Innovative Solutions for Faster Construction

EFCO’s PLATE GIRDER® Column Formwork proved highly effective, handling column sizes from 1200 mm x 1200 mm (4′ x 4′) at ground level to 1000 mm x 1000 mm (3′-6″ x 3′-6″) at higher elevations. Its robust design minimized deflection, maintained structural integrity during pours, and facilitated smoother, controlled concrete flow. The allowable pour pressure is 57 kPa (1200 psf), and the maximum pouring height is 6 m (20 ft). This led to faster pour times, reduced surface irregularities, and less leakage compared to alternative systems.

The E-Z DECK® Shoring System, constructed with lightweight aluminum components, further enhanced efficiency with its reduced weight, streamlined accessories, and rigid structure, allowing quicker installation, dismantling, and cycling. Additionally, EFCO’s Crazy Wheel Dolly system simplified the movement of large table forms, enabling just three to four workers to transport them, significantly boosting productivity.

Enhancing Efficiency and Reducing Costs

The SUPER STUD® System used in the lift core walls allowed the contractor to cast full floor heights in a single pour, achieving an impressive 6.4 m (21 ft) casting height with minimal adjustments. EFCO’s Flipper Lock System ensured the fast and secure cycling of formwork components, further expediting the process while maintaining safety standards.

By reducing the need for accessories, minimizing setup time, and providing superior pour pressure resistance, EFCO’s systems enabled rapid progress through the construction cycle. These solutions collectively delivered the lowest in-place concrete cost by saving time, reducing labor expenses, and optimizing material usage—all while upholding the highest safety standards.

Project Results and Efficiency Gains

The project’s success is evident in its remarkable efficiency metrics. An average of 31 columns were poured per floor, with six sets of EFCO column forms utilized. Casting speeds averaged two days per column, while slab shoring, covering approximately 4,200 m² (45,200 ft2), was completed in 22 days per floor using 1.5 floors of E-Z DECK®. Additionally, the lift core erection and formwork closure were completed in just three days, ensuring tight deadlines were met with precision.

Infinaxis Data Centre | Cyberjaya, Selangor, Malaysia

 

Why China State Construction & Engineering Chose EFCO

China State Construction & Engineering (M) Sdn Bhd selected EFCO for our proven commitment to quality, innovation, and super service. Our solutions offered a faster, more efficient approach to completing this complex data center project, delivering significant cost savings. The ongoing support and responsiveness from EFCO’s engineering and field service teams enabled the contractor to meet tight deadlines while maintaining high standards. By choosing EFCO, the contractor ensured the project was completed efficiently and focused on achieving the lowest in-place concrete cost, contributing to the project’s overall success.

EFCO EQUIPMENT

PLATE GIRDER®

E-Z DECK®

SUPER STUD®

Crazy Wheel Dolly

China State Construction & Engineering (M) Sdn Bhd   

Mr. Zhu Zi Jiang, Project Manager

Mr. Zhang Xiu Hong, Chief Engineer

EFCO FORMWORK Specialists – Malaysia   

Ben Chen, Territory Manager

Alvin Wong, Territory Manager

Foo Ming Huang, Field Supervisor

Johnson Chai, Field Supervisor

Kevin Khor, District Engineer

Project Photos

Trusted Formwork Partner

Why Trust Anyone Else?

We are ready to assist you in finding the best forming and shoring solutions for your construction projects. 

Contact Us Today!