Sungai Besi-Ulu Kelang Elevated Expressway – Damansara Perdana, Malaysia
About the Customer
Company: China Communications Construction Company (M) Sdn. Bhd.
Project Location: Damansara Perdana, Malaysia
Project Requirements
- 3.3 miles (5.2 km) of elevated expressway mainline structures and minor at-grade construction
- post-tensioned concrete portal beams 6′-7″ and 8′-3″ (2.0 and 2.5 m) in width and a maximum of 13′-2″ (4 m) in depth. Lengths range from 65′-8″ to 164′-1″ (20 m to 50 m) with corbels at each side of the beam
- The shoring height varies from 19′-9″ to 29′-7″ (6 m to 9 m)
- Over 100 Piers
Formwork Used
Project Overview
The Sungai Besi-Ulu Kelang Elevated Expressway (SUKE) is a 15.2 mi (24.4 km), three-lane, dual-carriageway running from Sri Petaling to Ulu Kelang. It has 14 interchanges and reaches out to over 60 residential areas and connects to major highways and roads in Kuala Lumpur.
Customer Benefits
- Ability to pre-assemble EFCO shore towers on the ground, then fly them into position by crane. This significantly enhanced erection efficiency and flexibility at the jobsite and enabled for a safe environment for workers
- The modular and standardized shoring towers EFCO provided also benefited CCCC in terms of saving the time it took to cycle equipment from pier to pier, largely due to fact that EFCO’s E-Z DECK shore towers can be easily moved fully assembled and modified to accommodate any height variance.