Town of Blackfalds Reservoir | Blackfalds, Alberta, Canada
A Complete Formwork and Shoring Package for the Blackfalds Water Reservoir
Blackfalds, Alberta, Canada
Why did the Town of Blackfalds build a new reservoir?
To double the town’s drinking-water storage and add backup supply for Blackfalds and the Aspelund Industrial Park. The reservoir is a large underground tank: poured in place, buried, and then filled. Because it holds potable water, the interior must be smooth, with no grooves or ridges where algae and sediment could collect.
Why choose a single-source formwork and shoring package?
Because one supplier for the walls, columns, and slab gave the contractor a consistent finish and one point of accountability. Caveman Contracting Inc. formed every concrete element with EFCO. EFCO LITE® handled the walls and columns, EFCO DECK® and E-Z DECK® formed and shored the slab, and PLATE GIRDER® with Combination Bias Corners (CBC) squared up the corners. The deciding factor was EFCO LITE®’s steel face, which leaves a smooth surface straight off the form and removes the joint patching a rougher finish would demand.

How do you form a smooth-finish reservoir wall?
With steel-faced wall formwork rated to carry the full pour pressure, so the wall strips clean without patching. On the Blackfalds reservoir, EFCO LITE® panels rated for 1,200 PSF (57.6 kPa) formed walls 13 ft 2 in. (4,025 mm) tall and 400 mm (1 ft 4 in.) thick. The crew stopped the forms just below the hooked reinforcing bars at the top of the wall, keeping the steel clear and avoiding lost time bending bars. SUPER STUD® soldiers and she-bolt ties carried the pressure, and Heavy-Duty Pipe Braces held the gangs plumb.

How do you form and shore a 22,500 sq ft roof slab?
By combining slab formwork with heavy-duty shoring sized to hold the entire footprint at one time. EFCO DECK® formed the 250 mm (9 7/8 in.) structural slab, which thickens to a 500 mm (about 1 ft 8 in.) drop capital over each of the 45 columns to carry the roof load down. In the deeper zones, the crew set E-Z DECK® posts, capped them with EFCO DECK® drop heads, and ran E-BEAM® primaries and secondaries above — pairing the reach of one system with the fast cycling of another. EFCO modeled the layout in Revit before anything shipped.

How does a complete EFCO package lower in-place concrete cost?
By designing rework out of the job and shoring the whole slab at once so it pours in fewer, larger placements. The steel-faced walls and columns came out smooth, removing an entire patch-and-grind step — the single biggest labor and schedule saving on a job like this. Shoring the full 22,500 sq ft (2,090 m²) footprint at once let the crew place 1,044 m³ (about 1,365 cu yd) of concrete in just two large pours instead of many small ones. One supplier for walls, columns, and slab meant one set of drawings and one point of coordination. Together, that is Lowest in-Place Concrete Cost (LIPCC) in practice.

Why Caveman Contracting Chose EFCO
For Caveman Contracting, the Blackfalds reservoir came down to building it right the first time. A drinking-water tank needs a clean interior finish, and EFCO LITE® delivered that straight off the panel, with no patching cycle to add later. Pairing EFCO DECK®, E-Z DECK®, and E-BEAM® over the drop capitals solved the shoring with a single coordinated system rather than a patchwork of parts. And because every forming component for the walls, columns, and slab came from EFCO, the contractor had a single accountable source for both engineering and delivery. On a project with a short timeline and no room for rework, that mix of finish, support, and single-source reliability is what delivers the Lowest in-Place Concrete Cost. It is why Caveman ran a complete EFCO package from footing to roof.
EFCO Equipment
Caveman Contracting Inc.
Sean Pringle, Owner
Timcon Construction Ltd., General Contractor
EFCO Formwork Specialists- Airdrie
Jeff Dergousoff, Territory Manager
Chris Manson, Engineer
Rob Cottam, Field Service
Check Out Our Most Recent Utilities & Water Treatment Formwork & Shoring Projects
Frequently Asked Questions
Trusted Formwork Partner
Why Trust Anyone Else?
We are ready to assist you in finding the best forming and shoring solutions for your construction projects.